When Richmond Hill homeowners ask about a kitchen renovation, the first question after “how much?” is almost always “how long will we be without a kitchen?” A 1970s split-level near Oak Ridges, a two-storey in Bayview Hill, a bungalow around Mill Pond and a newer build in Jefferson or Crosby all have different layouts, but the work still moves through the same phases. This guide walks through a typical kitchen renovation Richmond Hill timeline phase by phase, with what drives the schedule and a checklist you can use before you book a quote.
Nehan Construction is run by Yama Nehan, a licensed contractor with about 20 years of hands-on construction experience and a construction engineering degree from George Brown (Building Renovations). Yama has also spent about 15 years as a home inspector and is among the top inspectors in Ontario, so every kitchen we plan gets looked at the way an inspector would look at it: old leaks under the sink, soft flooring at the dishwasher, outdated wiring near the range and ceilings that are not level, before cabinets are ordered.
Key Takeaways
- A kitchen renovation moves through planning, demolition and rough work, cabinets, countertops, then flooring, paint and final hook-ups.
- Layout changes, custom cabinets and countertop templating are the biggest schedule drivers; a straight like-for-like kitchen moves faster.
- A 10×10 kitchen is typically around $19,995 including upper and lower cabinets, quartz countertops, sink, faucet, install of client-supplied appliances, demolition and disposal, plus flooring, pot lights and painting, plus HST.
- Appliances are client-supplied; upgrades and layout changes raise the price. The final price is confirmed after a free site visit.
- Electrical, plumbing and HVAC work is done by our licensed subcontractors, and the job is fully insured.
What shapes a kitchen renovation timeline in Richmond Hill?
Richmond Hill kitchens vary by neighbourhood. Older homes near Lake Wilcox and Mill Pond often have smaller footprints and dated plumbing. Bayview Hill and Jefferson kitchens are often larger, where owners want a layout change, an island or more pot lights. Oak Ridges and Crosby kitchens are frequently mid-size with builder-grade cabinets owners want to replace without moving the sink or range. Keeping the layout shortens the schedule; moving the sink, range or fridge, custom cabinets or stone templating adds time.
For a sense of what a typical kitchen includes and what drives cost, see our 10×10 kitchen renovation cost guide and our main kitchen renovation page.
What does each phase of the kitchen renovation look like?
Every kitchen is a little different, but most projects follow this order. Durations below are in plain language because cabinet lead times, stone shops and layout changes all shift the calendar. We put the plan for your home in writing with your quote.
| Phase | What happens | Typical duration drivers |
|---|---|---|
| Planning and selections | Site visit, scope, cabinet style, quartz colour, flooring, lighting and appliance spots | How quickly selections are locked; layout changes need more measuring |
| Demolition and rough work | Old cabinets and flooring out; plumbing, electrical and framing changes for the new layout | Like-for-like is faster; moving sinks or ranges takes longer |
| Cabinets and appliances | New cabinets installed; client-supplied appliances set in place for final fit | Stock vs. custom cabinet lead times |
| Countertops | Template after cabinets are set; fabricate; install quartz, sink and faucet | Stone shop schedule after templating |
| Flooring, paint and finishing | Flooring, pot lights trim-out, paint, backsplash if included, final caulk and touch-ups | Room size and whether flooring runs into adjoining spaces |
| Final walkthrough | Test sinks, lights and appliances; punch-list touch-ups; handoff | Usually a short visit once finishes are dry |
A straightforward 10×10 kitchen that keeps the same layout usually moves through these phases faster than one with a new island, relocated plumbing or custom cabinets. We are honest about that up front so you can plan around the work.
How do cost and schedule connect?
For a 10×10 kitchen, our base price is typically around $19,995 including labour and materials: upper and lower cabinets, quartz countertops, sink, faucet, installation of client-supplied appliances, demolition and disposal, plus flooring, pot lights and painting, plus HST. Appliances are supplied by the client. Upgrades, a larger footprint or layout changes raise the price, and the final price is confirmed after a site visit.
The same extras that raise the price usually stretch the timeline: custom cabinets, moving the sink or range, premium stone with a longer shop queue, or flooring into the dining room. If you are also planning a bathroom, see our bathroom renovation page. Some homeowners also ask about basement moisture; see our basement flood protection services if that is on your list.
Why does an inspector’s eye matter before cabinets are ordered?
Ordering cabinets over a soft subfloor, a slow leak under the dishwasher or an overloaded circuit is a costly mistake. With about 15 years of home inspection behind him, Yama looks for these at the free site visit so they are in the plan before demolition. Electrical, plumbing and HVAC work is handled by our licensed subcontractors, and the job is fully insured. That mix of construction experience and inspector-level checks is why homeowners choose us across Richmond Hill, the GTA and Hamilton.
Kitchen renovation timeline checklist
- Decide whether you want to keep the current layout or move the sink, range or fridge.
- List must-haves vs. nice-to-haves: cabinet style, quartz colour, flooring, pot lights, backsplash.
- Confirm appliance sizes early so cabinet openings match what you will buy.
- Plan how the household will cook while the kitchen is down (temporary setup, takeout budget, fridge location).
- Book a free site visit and get a written, itemized quote with the phase plan.
- Ask what is included vs. upgrade, and confirm licensed trades and insurance.
- Lock selections before cabinets are ordered so templating and install stay on track.
- Agree on payment milestones and how change requests are priced in writing.
Why Richmond Hill homeowners choose Nehan Construction
We are a licensed contractor with low overhead, so pricing stays fair and quotes spell out what is included. Yama brings about 20 years of construction experience, a construction engineering degree from George Brown and about 15 years as one of Ontario’s top home inspectors to every kitchen. Learn more about Yama and Nehan Construction.
Frequently asked questions
Do you do kitchen renovations in Richmond Hill?
Yes. Nehan Construction renovates kitchens across Richmond Hill, including Oak Ridges, Bayview Hill, Mill Pond, Jefferson, Crosby and Lake Wilcox, along with the rest of the GTA and Hamilton.
How long does a kitchen renovation take in Richmond Hill?
It depends on layout, cabinet lead times and countertop templating. A like-for-like 10×10 kitchen moves through the phases faster than a kitchen with layout changes or custom cabinets. We give you a written phase plan with your quote.
How much does a 10×10 kitchen renovation cost?
Typically around $19,995 for a 10×10 kitchen including upper and lower cabinets, quartz countertops, sink, faucet, install of client-supplied appliances, demolition and disposal, plus flooring, pot lights and painting, plus HST. Appliances are client-supplied. Upgrades and layout changes raise the price, and the final price is confirmed after a site visit.
What slows a kitchen renovation down the most?
Late design changes, custom cabinet lead times, waiting on stone after templating, and hidden water damage found once old cabinets come out. Locking selections early and a thorough site visit keep the schedule tighter.
Can we live in the house during the kitchen renovation?
Most families do. We contain dust as much as practical and help you plan a temporary cooking setup. Expect limited kitchen use while demolition, cabinets and countertops are underway.
Is the site visit free?
Yes. We visit your home, look at the kitchen the way an inspector would and give you a clear written quote with no obligation.
Book a free kitchen site visit in Richmond Hill
Ready to map out your kitchen renovation Richmond Hill timeline? Get a clear, phase-by-phase plan from a licensed contractor with fair pricing. Call or text 647-704-7100, email nehanconstruction@gmail.com, or request a free estimate online.
Leave A Comment