If you own a home in Oshawa and both the kitchen and the bathroom are overdue, the hardest part is often deciding which renovation to do first. Whether you live in an older home near Downtown Oshawa or McLaughlin, or a newer build in Windfields, Taunton or Kedron, the right order depends on condition, budget, how your family uses the house and whether you plan to sell. This guide walks through how to decide, compares the two projects side by side and ends with a simple checklist.

Nehan Construction is run by Yama Nehan, a licensed contractor with about 20 years of hands-on construction experience and a construction engineering degree from George Brown (Building Renovations). Yama also has about 15 years of home inspection experience and is among the top inspectors in Ontario, which helps when you are deciding what to fix first: we look for hidden leaks, soft subfloors, poor ventilation and tired plumbing that can quietly make one room the more urgent job.

Key Takeaways

  • Fix what is failing first: an active leak, soft floor, mould or a bathroom fan that does not work makes the bathroom the priority.
  • If both rooms work, start with the room your household uses most or the one that bothers you every day.
  • A full 3-piece bathroom with a tub is typically around $9,995 including labour and materials, plus HST.
  • A 10×10 kitchen is typically around $19,995 including labour and materials, plus HST, with flooring, pot lights and painting included.
  • A bathroom usually takes about a week; a kitchen takes longer and disrupts daily meals more.
  • Final prices are confirmed after a free site visit, and upgrades or layout changes raise the price.

Should you renovate the kitchen or the bathroom first?

Start with the room that has a real problem. Water is the most common one. A bathroom with a leaking tub surround, loose tiles, a spongy floor near the toilet or mould on the ceiling can damage the ceiling and finishes below it if it waits, so it usually goes first. If neither room has a problem, choose the one that improves daily life the most. For a busy family that cooks every night, that is often the kitchen. For a home with one bathroom shared by everyone, the bathroom often wins.

Budget and timing matter too. A bathroom is the smaller, faster project, so some homeowners do it first, live with the result and save for the kitchen. Others do the kitchen first because it is the room they want to enjoy most. Either order works when it is planned.

Kitchen vs. bathroom renovation compared

Factor Bathroom (full 3-piece with tub) Kitchen (10×10)
Typical starting price Typically around $9,995 including labour and materials, plus HST Typically around $19,995 including labour and materials, plus HST
Typical time on site About a week (around 7 business days) for a simple tub bathroom Longer, depending on cabinets, countertops and layout
Daily disruption Hard if it is your only bathroom No full kitchen for meals while work is underway
Risk of waiting Higher if there are leaks, soft floors or poor ventilation Usually lower unless plumbing or wiring is failing
What raises the price Walk-in shower, larger room, upgraded tile and fixtures Layout changes, more cabinets, upgraded finishes

Want the details? Our guides cover what a full 3-piece bathroom renovation includes and what a 10×10 kitchen renovation includes.

What does each price typically include?

For a 10×10 kitchen, the price of typically around $19,995 including labour and materials, plus HST, covers upper and lower cabinets, quartz countertops, a sink and faucet, installation of appliances you supply, demolition and disposal, plus flooring, pot lights and painting. Appliances are supplied by the homeowner. A full 3-piece bathroom with a tub is typically around $9,995 including labour and materials, plus HST. If you would rather have a stand-up walk-in shower instead of a tub, a full 3-piece with a walk-in shower is typically around $13,995 including labour and materials, plus HST. These are base figures. Upgrades or extra items you choose raise the price, and every final price is confirmed after a free site visit.

Signs the bathroom should go first

  • Cracked or loose tiles, failing grout or caulking around the tub
  • A soft or bouncy floor near the toilet or tub
  • Peeling paint, mould or condensation that does not clear because the fan is weak or missing
  • Water stains on the ceiling below the bathroom
  • Your household shares one bathroom and it no longer works for you

Signs the kitchen should go first

  • Cabinet doors, drawers or boxes are falling apart or water-damaged under the sink
  • Counter space and storage do not fit how your family cooks
  • Poor lighting makes the room hard to work in
  • You are planning to sell and the kitchen is the most dated room buyers will see
  • The bathrooms are in decent shape and the kitchen is the room you want to enjoy most

A situation we often see

An Oshawa homeowner calls about a kitchen, but during the site visit the bathroom upstairs has a soft spot by the tub and old staining on the kitchen ceiling right below it. In a case like that, we recommend handling the bathroom first. Renovating the kitchen and then opening the ceiling later to deal with a bathroom leak would mean paying to redo finished work.

Can you do both at once?

Yes, and some homeowners prefer one longer disruption over two. Doing both together lets us plan the schedule as one project. The trade-off is a bigger budget up front and more of the house out of use at the same time. We can quote them together or separately so you can compare.

Checklist before you decide

  • Walk both rooms and note any leaks, soft spots, stains or musty smells.
  • Decide which room causes the most daily frustration.
  • Set a total budget and know the base figures for each room.
  • Think about timing: holidays, guests, school schedules or a planned sale.
  • Ask for an itemized written quote for each room so you can compare.
  • Confirm your contractor is licensed and fully insured and uses licensed trades.

Thinking about the basement too? See our guide to basement renovation in Whitby and Oshawa.

Why Oshawa homeowners choose Nehan Construction

We are a licensed contractor with low overhead, so pricing stays fair and quotes spell out what is included. We are fully insured and work with licensed electrical, plumbing and HVAC subcontractors. Yama brings about 20 years of construction experience, a construction engineering degree from George Brown and about 15 years as one of Ontario’s top home inspectors to every kitchen renovation and bathroom renovation we take on.

Frequently asked questions

Is it better to renovate the kitchen or the bathroom first?

Fix whichever room has a real problem first, usually a bathroom with leaks, soft floors or poor ventilation. If both rooms work, start with the one your household uses most or the one that frustrates you every day.

How much does a kitchen renovation cost in Oshawa?

A 10×10 kitchen is typically around $19,995 including labour and materials, plus HST, with flooring, pot lights and painting included and appliances supplied by you. Layout changes or upgrades raise the price, and the final price is confirmed after a site visit.

How much does a bathroom renovation cost in Oshawa?

A full 3-piece bathroom with a tub is typically around $9,995 including labour and materials, plus HST. With a walk-in shower instead of a tub, it is typically around $13,995 including labour and materials, plus HST. Upgrades raise the price, and the final price is confirmed after a site visit.

How long does a bathroom renovation take?

A simple tub bathroom takes about a week, around 7 business days. Larger rooms, walk-in showers or upgraded finishes can take longer.

Do you renovate kitchens and bathrooms across Oshawa?

Yes. Nehan Construction works across Oshawa, including Windfields, Taunton, Kedron, McLaughlin and Downtown Oshawa, along with Whitby, Ajax, Pickering and the rest of the GTA and Hamilton.

Book a free site visit in Oshawa

Not sure whether the kitchen or bathroom should come first? A licensed contractor will look at both rooms, point out anything urgent and give you clear written quotes. Call or text 647-704-7100, email nehanconstruction@gmail.com, or request a free estimate online.