The main bathroom with a tub is the hardest-working room in most Ontario homes. When the tile is cracked, the caulking keeps failing and the fan barely moves air, a full renovation is usually the right fix. As a licensed contractor, Nehan Construction prices a full 3-piece bathroom renovation with a tub at typically around $9,995, including labour and materials. Below is exactly what goes into that kind of job, based on the way we scope our real bathroom quotes.

Prices are plus HST.

Key Takeaways

  • A full 3-piece bathroom renovation with a tub is typically around $9,995, including labour and materials.
  • The final price is confirmed after a free site visit, and the scope can vary from home to home.
  • Waterproofing behind the tub surround is the most important part of the job, even though you never see it.
  • A typical tub bathroom takes about 7 business days on site.
  • Payments follow milestones, so you are never paying far ahead of the work.

How much does a full bathroom renovation cost in Ontario?

For a standard 3-piece bathroom with a tub, our price is around $9,995, including labour and materials. That is a full renovation, not a cosmetic refresh: new tub, new tile surround with proper waterproofing behind it, new toilet, new floor tile, new lighting and fan, wall repairs, paint and trim. The final price is confirmed in writing after a free site visit.

Why can the scope of a tub bathroom vary?

No two bathrooms or homeowners are the same, so the scope is set for each job. Some clients supply their own vanity, sink and faucet. Some handle demolition and disposal themselves to save money. Others want extra items, like more pot lights or a niche in the tub wall. Each of these changes the price up or down, which is why we write the quote around your actual room and choices after the site visit.

What is included in a full bathroom renovation with a tub?

Here is what a typical tub bathroom scope looks like, based on our real quotes:

  • Cement backer board plus a RedGard waterproof membrane behind the tub area
  • New bathtub (allowance around $400)
  • Full tile tub surround and a new tiled floor (tile allowance around $4 per square foot)
  • Shower valve, trim, shower head and tub faucet kit (allowance around $300, Moen)
  • New water-efficient toilet (allowance around $225, American Standard)
  • Rough-in plumbing and electrical adjustments for the layout, by licensed trade partners
  • GFCI outlet, wiring adjustments and up to 4 LED pot lights
  • Quiet, high-airflow exhaust fan
  • Wallpaper removal, wall repairs, plaster smoothing and multi-coat bathroom paint
  • Baseboards and quarter-round trim
  • Toilet paper holder and towel bars (allowance around $50) and a mounted mirror (allowance around $100)

The allowances tell you what each item is budgeted at. If you pick a tub, tile or fixture that costs more, you only pay the difference. If you pick something less expensive, the price comes down.

How does a tub bathroom compare with other bathroom types?

Bathroom type What it usually involves Price (labour and materials)
Powder room (2-piece) Toilet, vanity, sink and faucet, flooring, paint, lighting and finishing Typically around $4,995
Full 3-piece bathroom with a tub (this guide) New tub with a full tile surround, waterproofing, toilet, tile floor, fan, lighting and finishing Typically around $9,995
3-piece bathroom with a walk-in shower Custom tiled stand-up shower with full waterproofing, toilet, tile floor, fan, lighting and finishing Typically around $13,995
Full master bathroom A larger ensuite with more tile, more fixtures and more finishing work Typically around $14,995

Every price includes labour and materials. The final price is confirmed in writing after a free site visit, once we have measured the room and seen what is behind the walls and floor.

Swapping the tub for a custom walk-in shower is the most common upgrade we are asked about. It costs more because the shower floor has to be built and waterproofed from scratch, and glass is added. Our walk-in shower bathroom cost guide explains the difference in detail.

What raises or lowers the cost of a bathroom renovation?

  • Size and layout: a standard 5-foot tub alcove keeps things simple. Moving the toilet, tub or vanity adds plumbing work.
  • Tile choices: large-format, natural stone or patterned tile takes more material and more labour than standard porcelain.
  • Fixtures: freestanding tubs, thermostatic valves and designer faucets cost more than the standard allowances.
  • Who supplies what: supplying your own vanity or doing your own demolition lowers the price.
  • What is behind the walls: old leak damage, a soft subfloor or past patch jobs have to be fixed before new tile goes on.

How long does a full bathroom renovation with a tub take?

A typical tub bathroom takes about 7 business days on site. The usual order is:

  1. Demolition and disposal (unless you are handling it), and protection of floors and hallways.
  2. Rough-in plumbing and electrical adjustments, and the new tub set in place.
  3. Cement backer board and RedGard waterproofing behind the tub area.
  4. Floor tile and the full tub surround.
  5. Wall repairs, smoothing and paint.
  6. Toilet, shower trim, fan, lighting, mirror, accessories and trim.
  7. Final walkthrough and clean-up.

How are payments structured?

Payments follow the work. A small booking deposit holds your start date, and the rest is paid in milestones: one at the start, one after the rough-in and waterproofing stage, one after tile, paint and fixtures, and the balance when the job is complete. You never pay far ahead of the work you can see.

Which other renovation costs should you compare?

If your bathroom is smaller, see our powder room renovation cost guide. If it is a larger ensuite, our master bathroom cost guide is the better fit. Planning the kitchen next? See our kitchen renovation services, or browse our bathroom renovation services.

Why choose Nehan Construction for your bathroom?

Nehan Construction is led by Yama Nehan, a licensed contractor with about 20 years of hands-on construction experience and a construction engineering education from George Brown (Building Renovations). Yama also has about 15 years of home inspection experience as one of the top home inspectors in Ontario. That background helps him catch hidden issues, like old leaks, soft subfloors, weak ventilation and poor past work, before new finishes go in, so they get fixed once instead of showing up after the job is done. Plumbing and electrical work is done with licensed trade partners. Learn more about Nehan Construction and Yama’s home inspection background.

Frequently Asked Questions

How much does a full bathroom renovation cost in Ontario?

With Nehan Construction, a full 3-piece bathroom renovation with a tub is typically around $9,995, including labour and materials. The final price is confirmed after a free site visit.

Does the price include the vanity?

It depends on the job. Some clients supply their own vanity, sink and faucet, and some handle demolition themselves. Your written quote lists exactly what is included.

What are material allowances?

An allowance is the amount budgeted for an item, such as around $400 for the tub or around $4 per square foot for tile. Choose something pricier and you pay the difference; choose something less and the price drops.

How long does a bathroom renovation with a tub take?

A typical tub bathroom takes about 7 business days on site, once materials are on hand.

Why does waterproofing matter so much?

Tile and grout are not waterproof on their own. A cement backer board and a waterproof membrane behind the tub surround keep water out of the wall, which protects the room for years.

How do payments work?

A small booking deposit holds your date, followed by milestone payments as the work progresses and the balance on completion.

Ready to price your bathroom? Call Yama Nehan at 647-704-7100 or email nehanconstruction@gmail.com to book a free site visit. You can also reach us through our contact page.